Solid Plastering/Render (Internal) — Safe Work Method Statement
Covers internal solid plastering and rendering operations including base coat, brown coat and finish coat application to masonry, concrete and cementitious substrates. Addresses cement dust and wet cement exposure, manual handling of bagged cement and sand, overhead plastering strain, and chemical hazards from admixtures and bonding agents.
5 work steps
6 hazards identified
6 control measures
5×5 risk matrix
Worker sign-off section
High-Risk Activity Categories
Hazardous Chemicals
Legislation Referenced
WHS Reg 2011, Part 3.1 - Managing risks to health and safety
WHS Reg 2011, Reg 351 - Managing risks of hazardous chemicals
WHS Reg 2011, Reg 60 - Hazardous manual tasks
WHS Reg 2011, Reg 351 - Hazardous chemicals
PPE Requirements
P2 respirator (cement dust) (AS/NZS 1716)
Safety glasses / goggles (AS/NZS 1337.1)
Alkali-resistant gloves (AS/NZS 2161.10)
Cut-resistant gloves (metal beads) (AS/NZS 2161.3)
Waterproof / steel-cap safety boots (AS/NZS 2210.3)
Hearing protection (mixer/pump) (AS/NZS 1270)
Australian Standards Referenced
AS/NZS 2589 — Gypsum Linings — Application and Finishing
AS 3700 — Masonry Structures
AS/NZS 1716 — Respiratory Protective Devices
AS/NZS 1337.1 — Personal Eye Protection
AS/NZS 2161.10 — Occupational Protective Gloves — Protective Gloves Against Chemicals and Micro-Organisms
$16.96
$19.95
15% off
Buy This Document
Buy Complete Plastering Pack — Save $34
WHS Reg s.299 Compliant
Editable Word Format
Instant Download
See a sample document →
Also Available As
More JSA Documents for Plastering
$16.96
Buy Now