Solid Plastering/Render (External with Scaffold) — Safe Work Method Statement
Covers external solid plastering and rendering operations from scaffold systems including cement render, acrylic render and texture coat application to external wall surfaces. Addresses fall hazards from scaffold, cement dust and chemical exposure, UV and heat stress, manual handling of materials at height, and adverse weather impacts on render application.
5 work steps
8 hazards identified
8 control measures
5×5 risk matrix
Worker sign-off section
High-Risk Activity Categories
Working At Heights
Legislation Referenced
WHS Reg 2011, Reg 291(1)(a) - Risk of fall of 2m or more
WHS Reg 2011, Part 3.1 - Managing risks to health and safety
WHS Reg 2011, Reg 351 - Managing risks of hazardous chemicals
WHS Reg 2011, Reg 60 - Hazardous manual tasks
PPE Requirements
P2 respirator (cement dust) (AS/NZS 1716)
Safety goggles (AS/NZS 1337.1)
Alkali-resistant gloves (AS/NZS 2161.10)
Non-slip sole safety boots (AS/NZS 2210.3)
Full body harness (secondary protection) (AS/NZS 1891.1)
Hard hat (ground personnel) (AS/NZS 1801)
Hi-visibility vest (AS/NZS 4602.1)
Sun protection (hat, SPF 50+ sunscreen) (N/A)
Hearing protection (pump/mixer) (AS/NZS 1270)
Australian Standards Referenced
AS/NZS 4576 — Guidelines for Scaffolding Safety
AS/NZS 1891.1 — Industrial Fall-Arrest Systems — Harnesses and Ancillary Equipment
AS 3700 — Masonry Structures
AS/NZS 1716 — Respiratory Protective Devices
AS/NZS 1337.1 — Personal Eye Protection
AS/NZS 2161.10 — Occupational Protective Gloves — Protective Gloves Against Chemicals and Micro-Organisms
AS/NZS 1801 — Occupational Protective Helmets
$16.96
$19.95
15% off
Buy This Document
Buy Complete Plastering Pack — Save $34
WHS Reg s.299 Compliant
Editable Word Format
Instant Download
See a sample document →
Also Available As
More JSA Documents for Plastering
$16.96
Buy Now