Plasterboard Repair and Patching — Safe Work Method Statement
Covers the repair and patching of damaged plasterboard walls and ceilings including hole patching, crack repair, water damage repair, sheet replacement and corner damage repair. Addresses concealed hazards behind damaged plasterboard (wiring, plumbing, asbestos), dust from cutting and sanding, and working from ladders for ceiling repairs.
5 work steps
6 hazards identified
6 control measures
5×5 risk matrix
Worker sign-off section
High-Risk Activity Categories
Hazardous Chemicals
Legislation Referenced
WHS Reg 2011, Part 3.1 - Managing risks to health and safety
WHS Reg 2011, Reg 39 - Provision of information, training and instruction
WHS Reg 2011, Reg 351 - Hazardous chemicals
PPE Requirements
P2 respirator (AS/NZS 1716)
Safety glasses / goggles (AS/NZS 1337.1)
Non-slip sole safety boots (AS/NZS 2210.3)
Nitrile gloves (AS/NZS 2161.10)
Hearing protection (power tools) (AS/NZS 1270)
Australian Standards Referenced
AS/NZS 2589 — Gypsum Linings — Application and Finishing
AS/NZS 2588 — Gypsum Plasterboard
AS/NZS 3000 — Wiring Rules (cable clearance requirements)
AS/NZS 1716 — Respiratory Protective Devices
AS/NZS 1337.1 — Personal Eye Protection
$16.96
$19.95
15% off
Buy This Document
Buy Complete Plastering Pack — Save $34
WHS Reg s.299 Compliant
Editable Word Format
Instant Download
See a sample document →
Also Available As
More JSA Documents for Plastering
$16.96
Buy Now