Drainage Installation (Commercial) — Safe Work Method Statement
Safe work procedures for installing commercial drainage systems including large-diameter sanitary, trade waste, and stormwater pipework in commercial buildings per AS/NZS 3500.2.
5 work steps
8 hazards identified
8 control measures
5×5 risk matrix
Worker sign-off section
High-Risk Activity Categories
Trenching
Powered Mobile Plant
Legislation Referenced
WHS Reg 2011, Reg 306 — excavation work
WHS Reg 2011, Reg 60 — manual tasks
WHS Reg 2011, Reg 291 — high risk construction work
PPE Requirements
Hard hat (AS/NZS 1801)
Safety footwear (AS/NZS 2210.3)
Hi-vis clothing (AS/NZS 4602.1)
Safety glasses / face shield (AS/NZS 1337.1)
Waterproof gloves (AS/NZS 2161.3)
Personal 4-gas monitor (AS/NZS 60079.29.1)
Australian Standards Referenced
AS/NZS 3500.2 — Plumbing and drainage — Sanitary plumbing and drainage
AS/NZS 3500.3 — Plumbing and drainage — Stormwater drainage
AS 3600 — Concrete structures (for pit and manhole construction)
AS/NZS 4602.1 — High visibility safety garments
$16.96
$19.95
15% off
Buy This Document
Buy Complete Plumbing Pack — Save $98
WHS Reg s.299 Compliant
Editable Word Format
Instant Download
See a sample document →
Also Available As
More JSA Documents for Plumbing
$16.96
Buy Now