Excavation and Trenching for Plumbing — Safe Work Method Statement
Safe work procedures for all excavation and trenching operations associated with plumbing work including trench preparation, shoring, benching, and safe entry requirements.
5 work steps
9 hazards identified
9 control measures
5×5 risk matrix
Worker sign-off section
High-Risk Activity Categories
Trenching
Energised Electrical
Powered Mobile Plant
Legislation Referenced
WHS Reg 2011, Reg 306 — excavation work
WHS Reg 2011, Reg 305 — notification of certain excavation work
WHS Reg 2011, Reg 60 — manual tasks
PPE Requirements
Hard hat (AS/NZS 1801)
Safety footwear (AS/NZS 2210.3)
Hi-vis clothing (Class D/N) (AS/NZS 4602.1)
Personal 4-gas monitor (AS/NZS 60079.29.1)
Hearing protection (AS/NZS 1270)
Safety glasses (AS/NZS 1337.1)
Australian Standards Referenced
AS/NZS 3500.2 — Plumbing and drainage — Sanitary plumbing and drainage
AS 4799 — Installation of underground utility services and pipelines within railway boundaries
AS/NZS 2865 — Confined spaces (for deep trench entry)
AS/NZS 4602.1 — High visibility safety garments
$16.96
$19.95
15% off
Buy This Document
Buy Complete Plumbing Pack — Save $98
WHS Reg s.299 Compliant
Editable Word Format
Instant Download
See a sample document →
Also Available As
More JSA Documents for Plumbing
$16.96
Buy Now