Stormwater Drainage Installation — Safe Work Method Statement
Safe work procedures for installing stormwater drainage systems including pits, pipes, retention systems, and connection to council stormwater infrastructure per AS/NZS 3500.3.
5 work steps
6 hazards identified
6 control measures
5×5 risk matrix
Worker sign-off section
High-Risk Activity Categories
Trenching
Traffic Corridor
Powered Mobile Plant
Legislation Referenced
WHS Reg 2011, Reg 306 — excavation work
WHS Reg 2011, Reg 60 — manual tasks
PPE Requirements
Hard hat (AS/NZS 1801)
Safety footwear (AS/NZS 2210.3)
Hi-vis clothing (AS/NZS 4602.1)
Safety glasses (AS/NZS 1337.1)
Hearing protection (AS/NZS 1270)
Riggers gloves (AS/NZS 2161.3)
Australian Standards Referenced
AS/NZS 3500.3 — Plumbing and drainage — Stormwater drainage
AS/NZS 3500.2 — Plumbing and drainage — Sanitary plumbing and drainage
AS 3725 — Design for installation of buried concrete pipes
AS/NZS 4602.1 — High visibility safety garments
$16.96
$19.95
15% off
Buy This Document
Buy Complete Plumbing Pack — Save $98
WHS Reg s.299 Compliant
Editable Word Format
Instant Download
See a sample document →
Also Available As
More JSA Documents for Plumbing
$16.96
Buy Now