Stormwater Drainage Installation — Safe Work Method Statement

Safe work procedures for installing stormwater drainage systems including pits, pipes, retention systems, and connection to council stormwater infrastructure per AS/NZS 3500.3.

5 work steps 6 hazards identified 6 control measures 5×5 risk matrix Worker sign-off section

High-Risk Activity Categories

Trenching Traffic Corridor Powered Mobile Plant

Legislation Referenced

WHS Reg 2011, Reg 306 — excavation work WHS Reg 2011, Reg 60 — manual tasks

PPE Requirements

Hard hat (AS/NZS 1801) Safety footwear (AS/NZS 2210.3) Hi-vis clothing (AS/NZS 4602.1) Safety glasses (AS/NZS 1337.1) Hearing protection (AS/NZS 1270) Riggers gloves (AS/NZS 2161.3)

Australian Standards Referenced

AS/NZS 3500.3 — Plumbing and drainage — Stormwater drainage AS/NZS 3500.2 — Plumbing and drainage — Sanitary plumbing and drainage AS 3725 — Design for installation of buried concrete pipes AS/NZS 4602.1 — High visibility safety garments
$16.96 $19.95 15% off
Buy This Document Buy Complete Plumbing Pack — Save $98
WHS Reg s.299 Compliant Editable Word Format Instant Download
See a sample document →

Also Available As

More JSA Documents for Plumbing

5+ packs delivered to Australian tradies
$16.96 Buy Now