SOP — Septic Tank Installation and Maintenance
5 work steps
0 hazards identified
0 control measures
5×5 risk matrix
Worker sign-off section
PPE Requirements
Hard hat (AS/NZS 1801)
Safety footwear / rubber boots (AS/NZS 2210.3)
Waterproof gloves (AS/NZS 2161.3)
Face shield (AS/NZS 1337.1)
Personal 4-gas monitor (AS/NZS 60079.29.1)
Hi-vis clothing (AS/NZS 4602.1)
Australian Standards Referenced
AS/NZS 1547 — On-site domestic wastewater management
AS/NZS 3500.2 — Plumbing and drainage — Sanitary plumbing and drainage
AS/NZS 2865 — Confined spaces
AS/NZS 4602.1 — High visibility safety garments
$33.96
$39.95
15% off
Buy This Document
Buy Complete Plumbing Pack — Save $195
WHS Reg s.299 Compliant
Editable Word Format
Instant Download
See a sample document →
Also Available As
More SOP Documents for Plumbing
$33.96
Buy Now