Septic Tank Installation and Maintenance — Safe Work Method Statement

Safe work procedures for installing new septic systems and maintaining existing on-site sewage management systems including pump-out, inspection, and absorption trench work per AS/NZS 1547.

5 work steps 7 hazards identified 7 control measures 5×5 risk matrix Worker sign-off section

High-Risk Activity Categories

Trenching Hazardous Chemicals Confined Space

Legislation Referenced

WHS Reg 2011, Reg 306 — excavation work WHS Reg 2011, Reg 50 — hazardous atmospheres WHS Reg 2011, Reg 66 — confined spaces

PPE Requirements

Hard hat (AS/NZS 1801) Safety footwear / rubber boots (AS/NZS 2210.3) Waterproof gloves (AS/NZS 2161.3) Face shield (AS/NZS 1337.1) Personal 4-gas monitor (AS/NZS 60079.29.1) Hi-vis clothing (AS/NZS 4602.1)

Australian Standards Referenced

AS/NZS 1547 — On-site domestic wastewater management AS/NZS 3500.2 — Plumbing and drainage — Sanitary plumbing and drainage AS/NZS 2865 — Confined spaces AS/NZS 4602.1 — High visibility safety garments
$16.96 $19.95 15% off
Buy This Document Buy Complete Plumbing Pack — Save $98
WHS Reg s.299 Compliant Editable Word Format Instant Download
See a sample document →

Also Available As

More JSA Documents for Plumbing

5+ packs delivered to Australian tradies
$16.96 Buy Now