Sewer Repair and Relining — Safe Work Method Statement
Safe work procedures for repair, replacement, and relining of sewer pipes including CCTV inspection, excavation repair, and trenchless relining methods per AS/NZS 3500.2.
5 work steps
7 hazards identified
7 control measures
5×5 risk matrix
Worker sign-off section
High-Risk Activity Categories
Hazardous Chemicals
Trenching
Hazardous Atmosphere
Legislation Referenced
WHS Reg 2011, Reg 306 — excavation work
WHS Reg 2011, Reg 50 — hazardous atmospheres
WHS Reg 2011, Reg 60 — manual tasks
PPE Requirements
Hard hat (AS/NZS 1801)
Safety footwear / rubber boots (AS/NZS 2210.3)
Waterproof gloves (AS/NZS 2161.3)
Face shield (AS/NZS 1337.1)
Personal 4-gas monitor (AS/NZS 60079.29.1)
Waterproof coveralls (AS/NZS 4602.1)
Australian Standards Referenced
AS/NZS 3500.2 — Plumbing and drainage — Sanitary plumbing and drainage
AS/NZS 2865 — Confined spaces (if sewer entry required)
AS 3894.1 — Site testing of protective coatings
AS/NZS 4602.1 — High visibility safety garments
$67.96
$79.95
15% off
Buy This Document
Buy Complete Plumbing Pack — Save $459
WHS Reg s.299 Compliant
Editable Word Format
Instant Download
See a sample document →
Also Available As
More SWMS Documents for Plumbing
$67.96
Buy Now