Skylights and Roof Penetrations — Safe Work Method Statement
Covers installation, replacement, and repair of skylights, roof ventilators, whirlybirds, flue penetrations, and other roof-mounted equipment requiring cutting or creating openings in the roof surface.
5 work steps
9 hazards identified
9 control measures
5×5 risk matrix
Worker sign-off section
High-Risk Activity Categories
Working At Heights
Legislation Referenced
WHS Reg 2011, Reg 291(1)(a) - Risk of fall of 2m or more
WHS Reg 2011, Reg 291(1)(c) - Risk of fall through an opening
PPE Requirements
Full body harness + lanyard (AS/NZS 1891.1)
Hard hat (AS/NZS 1801)
Safety footwear (non-slip) (AS/NZS 2210.3)
Safety glasses (AS/NZS 1337.1)
Cut-resistant gloves (AS/NZS 2161.3)
Hearing protection (AS/NZS 1270)
P2 respirator (when cutting) (AS/NZS 1716)
Australian Standards Referenced
AS/NZS 1891.1 — Industrial fall-arrest systems and devices
AS/NZS 4994.1 — Temporary edge protection
AS/NZS 3000 — Electrical installations (Wiring Rules)
AS/NZS 1270 — Acoustics — Hearing protectors
AS/NZS 1716 — Respiratory protective devices
$16.96
$19.95
15% off
Buy This Document
Buy Complete Roofing Pack — Save $34
WHS Reg s.299 Compliant
Editable Word Format
Instant Download
See a sample document →
Also Available As
More JSA Documents for Roofing
$16.96
Buy Now