Scaffold Erection and Use for Roofing — Safe Work Method Statement
Covers erection, alteration, use, and dismantling of scaffolding for roofing projects including modular scaffold, tube and coupler systems, and mobile scaffold towers on residential and commercial sites.
5 work steps
10 hazards identified
10 control measures
5×5 risk matrix
Worker sign-off section
High-Risk Activity Categories
Working At Heights
Scaffold Erection
Legislation Referenced
WHS Reg 2011, Reg 291(1)(a) - Risk of fall of 2m or more
WHS Reg 2011, Reg 224 - Scaffolding work requiring high risk work licence
WHS Reg 2011, Reg 225 - Basic scaffolding (up to 4m)
WHS Reg 2011, Reg 226 - Intermediate scaffolding (up to 15m)
WHS Reg 2011, Reg 227 - Advanced scaffolding (above 15m or special types)
PPE Requirements
Full body harness + lanyard (erection/dismantling) (AS/NZS 1891.1)
Hard hat (AS/NZS 1801)
Safety footwear (AS/NZS 2210.3)
Gloves (AS/NZS 2161.1)
Safety glasses (AS/NZS 1337.1)
High-visibility vest (AS/NZS 4602.1)
Australian Standards Referenced
AS/NZS 4576 — Guidelines for scaffolding safety
AS/NZS 1576.1 — Scaffolding — General requirements
AS/NZS 1576.2 — Scaffolding — Couplers and accessories
AS/NZS 1576.3 — Scaffolding — Prefabricated and tube-and-coupler scaffolding
AS/NZS 1891.1 — Industrial fall-arrest systems and devices
AS/NZS 1801 — Occupational protective helmets
$16.96
$19.95
15% off
Buy This Document
Buy Complete Roofing Pack — Save $34
WHS Reg s.299 Compliant
Editable Word Format
Instant Download
See a sample document →
Also Available As
More JSA Documents for Roofing
$16.96
Buy Now