Scaffold Erection and Use for Roofing — Safe Work Method Statement

Covers erection, alteration, use, and dismantling of scaffolding for roofing projects including modular scaffold, tube and coupler systems, and mobile scaffold towers on residential and commercial sites.

5 work steps 10 hazards identified 10 control measures 5×5 risk matrix Worker sign-off section

High-Risk Activity Categories

Working At Heights Scaffold Erection

Legislation Referenced

WHS Reg 2011, Reg 291(1)(a) - Risk of fall of 2m or more WHS Reg 2011, Reg 224 - Scaffolding work requiring high risk work licence WHS Reg 2011, Reg 225 - Basic scaffolding (up to 4m) WHS Reg 2011, Reg 226 - Intermediate scaffolding (up to 15m) WHS Reg 2011, Reg 227 - Advanced scaffolding (above 15m or special types)

PPE Requirements

Full body harness + lanyard (erection/dismantling) (AS/NZS 1891.1) Hard hat (AS/NZS 1801) Safety footwear (AS/NZS 2210.3) Gloves (AS/NZS 2161.1) Safety glasses (AS/NZS 1337.1) High-visibility vest (AS/NZS 4602.1)

Australian Standards Referenced

AS/NZS 4576 — Guidelines for scaffolding safety AS/NZS 1576.1 — Scaffolding — General requirements AS/NZS 1576.2 — Scaffolding — Couplers and accessories AS/NZS 1576.3 — Scaffolding — Prefabricated and tube-and-coupler scaffolding AS/NZS 1891.1 — Industrial fall-arrest systems and devices AS/NZS 1801 — Occupational protective helmets
$67.96 $79.95 15% off
Buy This Document Buy Complete Roofing Pack — Save $106
WHS Reg s.299 Compliant Editable Word Format Instant Download
See a sample document →

Also Available As

More SWMS Documents for Roofing

5+ packs delivered to Australian tradies
$67.96 Buy Now