Concrete Pumping — Safe Work Method Statement

Covers boom pump and line pump setup, operation, pipeline connection, blockage clearing, and washout for concrete placement on residential and commercial projects.

5 work steps 8 hazards identified 8 control measures 5×5 risk matrix Worker sign-off section

High-Risk Activity Categories

Powered Mobile Plant Energised Electrical

Legislation Referenced

WHS Reg 2011, Reg 291(1)(l) - Work involving powered mobile plant WHS Reg 2011, Reg 291(1)(j) - Work on or near energised electrical installations WHS Reg 2011, Reg 214 - Duties relating to plant

PPE Requirements

Hard hat (Type 1) (AS/NZS 1801) Safety footwear (steel cap) (AS/NZS 2210.3) Safety glasses (AS/NZS 1337.1) Hi-visibility vest (Class D/N) (AS/NZS 4602.1) Gloves (task-appropriate) (AS/NZS 2161.1)

Australian Standards Referenced

AS/NZS 1801 — Occupational protective headwear AS/NZS 2210.3 — Occupational protective footwear
$16.96 $19.95 15% off
Buy This Document Buy Complete Concreting Pack — Save $42
WHS Reg s.299 Compliant Editable Word Format Instant Download
See a sample document →

Also Available As

More JSA Documents for Concreting

5+ packs delivered to Australian tradies
$16.96 Buy Now