Formwork Construction — Safe Work Method Statement

Covers erection, bracing, and stripping of formwork systems for concrete slabs, walls, columns, and beams including proprietary and traditional timber formwork on residential and commercial projects.

5 work steps 9 hazards identified 9 control measures 5×5 risk matrix Worker sign-off section

High-Risk Activity Categories

Working At Heights Structural Temp Support

Legislation Referenced

WHS Reg 2011, Reg 291(1)(a) - Risk of fall of 2m or more WHS Reg 2011, Reg 305 - Formwork must be designed and erected by competent person

PPE Requirements

Hard hat (Type 1) (AS/NZS 1801) Safety footwear (steel cap) (AS/NZS 2210.3) Safety glasses (AS/NZS 1337.1) Hi-visibility vest (Class D/N) (AS/NZS 4602.1) Gloves (task-appropriate) (AS/NZS 2161.1)

Australian Standards Referenced

AS/NZS 1801 — Occupational protective headwear AS/NZS 2210.3 — Occupational protective footwear
$16.96 $19.95 15% off
Buy This Document Buy Complete Concreting Pack — Save $42
WHS Reg s.299 Compliant Editable Word Format Instant Download
See a sample document →

Also Available As

More JSA Documents for Concreting

5+ packs delivered to Australian tradies
$16.96 Buy Now