Steel Reinforcement Fixing — Safe Work Method Statement
Covers delivery, storage, cutting, bending, placement, tying, and lapping of steel reinforcement bars and mesh for footings, slabs, walls, columns, and beams on residential and commercial projects.
5 work steps
8 hazards identified
8 control measures
5×5 risk matrix
Worker sign-off section
High-Risk Activity Categories
Powered Mobile Plant
Legislation Referenced
WHS Reg 2011, Reg 291(1)(l) - Work involving powered mobile plant
WHS Reg 2011, Reg 36 - Duty to identify hazards
WHS Reg 2011, Reg 60 - Manual tasks involving risk
PPE Requirements
Hard hat (Type 1) (AS/NZS 1801)
Safety footwear (steel cap) (AS/NZS 2210.3)
Safety glasses (AS/NZS 1337.1)
Hi-visibility vest (Class D/N) (AS/NZS 4602.1)
Gloves (task-appropriate) (AS/NZS 2161.1)
Australian Standards Referenced
AS/NZS 1801 — Occupational protective headwear
AS/NZS 2210.3 — Occupational protective footwear
$16.96
$19.95
15% off
Buy This Document
Buy Complete Concreting Pack — Save $42
WHS Reg s.299 Compliant
Editable Word Format
Instant Download
See a sample document →
Also Available As
More JSA Documents for Concreting
$16.96
Buy Now