Precast Element Installation — Safe Work Method Statement
Covers delivery, unloading, rigging, crane lifting, placement, and temporary propping of precast concrete elements including beams, columns, stairs, planks, and panels on commercial and industrial projects.
5 work steps
7 hazards identified
7 control measures
5×5 risk matrix
Worker sign-off section
High-Risk Activity Categories
Tilt Up Precast
Powered Mobile Plant
Working At Heights
Legislation Referenced
WHS Reg 2011, Reg 291(1)(p) - Tilt-up or precast concrete construction
WHS Reg 2011, Reg 291(1)(l) - Work involving powered mobile plant
WHS Reg 2011, Reg 291(1)(a) - Risk of fall of 2m or more
PPE Requirements
Hard hat (Type 1) (AS/NZS 1801)
Safety footwear (steel cap) (AS/NZS 2210.3)
Safety glasses (AS/NZS 1337.1)
Hi-visibility vest (Class D/N) (AS/NZS 4602.1)
Gloves (task-appropriate) (AS/NZS 2161.1)
Australian Standards Referenced
AS/NZS 1801 — Occupational protective headwear
AS/NZS 2210.3 — Occupational protective footwear
$16.96
$19.95
15% off
Buy This Document
Buy Complete Concreting Pack — Save $42
WHS Reg s.299 Compliant
Editable Word Format
Instant Download
See a sample document →
Also Available As
More JSA Documents for Concreting
$16.96
Buy Now