Demolition Emergency
Residential, commercial, asbestos, excavation, and hazmat removal
Demolition Complete Pack
4 documents — everything you need for demolition compliance.
Not sure your current documents are compliant? Run the free WHS compliance check →
Demolition is one of the highest-risk construction activities in Australia, explicitly listed under WHS Regulations s.291 as high-risk construction work. A SWMS is mandatory for all demolition operations.
Our demolition SWMS pack is our most comprehensive with 15 documents covering residential demolition, commercial structural demolition, asbestos removal, hazardous materials handling, excavation, plant operations, and environmental controls. Each document addresses the severe hazards inherent in demolition including structural collapse, asbestos fibre exposure, falling debris, underground service strikes, and dust and noise exposure.
Key Hazards Covered
- Structural collapse during demolition
- Asbestos fibre exposure and contamination
- Falling debris and materials
- Underground service strikes (gas, electrical, water)
- Dust, noise, and vibration exposure
- Plant and heavy machinery operations
- Hazardous materials (lead paint, PCBs, chemicals)
Relevant Australian Standards
- AS 2601 Demolition of structures
- AS/NZS 2161 Occupational protective gloves
- AS/NZS 1715 Respiratory protective devices
- AS 2436 Guide to noise and vibration control
Individual Documents — $41.95 each
Demolition Emergency — Common Questions
Are emergency procedures a legal requirement?
Yes. Under WHS Regulation 43, PCBUs must prepare, maintain, and implement an emergency plan for the workplace. Workers must be trained in emergency procedures.
What emergencies do your procedures cover?
Our procedures cover trade-specific emergencies including injuries, chemical exposure, fire, electrical incidents, structural collapse, severe weather, and medical emergencies.
Do emergency procedures include notification requirements?
Yes. Each procedure includes who to notify (emergency services, regulators, site managers), when to notify them, and what information to provide.
Last updated: March 2026