Demolition Risk Assessment
Residential, commercial, asbestos, excavation, and hazmat removal
Demolition Risk Assessment
One document — covers demolition for this product type.
Not sure your current documents are compliant? Run the free WHS compliance check →
Demolition is one of the highest-risk construction activities in Australia, explicitly listed under WHS Regulations s.291 as high-risk construction work. A SWMS is mandatory for all demolition operations.
Our demolition SWMS pack is our most comprehensive with 15 documents covering residential demolition, commercial structural demolition, asbestos removal, hazardous materials handling, excavation, plant operations, and environmental controls. Each document addresses the severe hazards inherent in demolition including structural collapse, asbestos fibre exposure, falling debris, underground service strikes, and dust and noise exposure.
Key Hazards Covered
- Structural collapse during demolition
- Asbestos fibre exposure and contamination
- Falling debris and materials
- Underground service strikes (gas, electrical, water)
- Dust, noise, and vibration exposure
- Plant and heavy machinery operations
- Hazardous materials (lead paint, PCBs, chemicals)
Relevant Australian Standards
- AS 2601 Demolition of structures
- AS/NZS 2161 Occupational protective gloves
- AS/NZS 1715 Respiratory protective devices
- AS 2436 Guide to noise and vibration control
Individual Documents — $33.95 each
Demolition Risk Assessment — Common Questions
What is the difference between a risk assessment and a SWMS?
A risk assessment provides a broad overview of all hazards for a scope of work at a site. A SWMS is task-specific and legally required for high-risk construction work. Both are important but serve different purposes.
Do I need a risk assessment if I have a SWMS?
Yes. A SWMS covers specific high-risk tasks. A site-specific risk assessment covers all hazards at the site, including those not classified as high-risk construction work.
What risk matrix do your assessments use?
Our risk assessments use a 5×5 likelihood-consequence matrix, providing initial risk ratings before controls and residual ratings after controls are applied.
Last updated: March 2026