Battery Storage System Installation — Safe Work Method Statement
Safe work procedures for the installation of lithium-ion and other battery energy storage systems (BESS) in residential and commercial settings, including mounting, DC/AC connections, BMS configuration, and commissioning.
5 work steps
6 hazards identified
6 control measures
5×5 risk matrix
Worker sign-off section
High-Risk Activity Categories
Electrical Work
Legislation Referenced
WHS Reg 2011, Reg 147 (electrical work)
WHS Reg 2011, Reg 164 (electrical licensing)
PPE Requirements
Insulated gloves (1000 V DC rated) (AS/NZS 2225)
Safety glasses (AS/NZS 1337.1)
Safety footwear (AS/NZS 2210.3)
Nitrile chemical-resistant gloves (AS/NZS 2161.10)
Australian Standards Referenced
AS/NZS 5139 — Electrical installations – Safety of battery systems for use with power conversion equipment
AS/NZS 5033 — Installation and safety requirements for photovoltaic (PV) arrays
AS/NZS 3000 — Wiring Rules
AS/NZS 2225 — Insulating gloves for electrical purposes
AS/NZS 3008 — Electrical installations – Selection of cables
$16.96
$19.95
15% off
Buy This Document
Buy Complete Electrical / HVAC / Solar Pack — Save $81
WHS Reg s.299 Compliant
Editable Word Format
Instant Download
See a sample document →
Also Available As
More JSA Documents for Electrical / HVAC / Solar
$16.96
Buy Now