Battery Storage System Installation — Safe Work Method Statement

Safe work procedures for the installation of lithium-ion and other battery energy storage systems (BESS) in residential and commercial settings, including mounting, DC/AC connections, BMS configuration, and commissioning.

5 work steps 6 hazards identified 6 control measures 5×5 risk matrix Worker sign-off section

High-Risk Activity Categories

Electrical Work

Legislation Referenced

WHS Reg 2011, Reg 147 (electrical work) WHS Reg 2011, Reg 164 (electrical licensing)

PPE Requirements

Insulated gloves (1000 V DC rated) (AS/NZS 2225) Safety glasses (AS/NZS 1337.1) Safety footwear (AS/NZS 2210.3) Nitrile chemical-resistant gloves (AS/NZS 2161.10)

Australian Standards Referenced

AS/NZS 5139 — Electrical installations – Safety of battery systems for use with power conversion equipment AS/NZS 5033 — Installation and safety requirements for photovoltaic (PV) arrays AS/NZS 3000 — Wiring Rules AS/NZS 2225 — Insulating gloves for electrical purposes AS/NZS 3008 — Electrical installations – Selection of cables
$67.96 $79.95 15% off
Buy This Document Buy Complete Electrical / HVAC / Solar Pack — Save $374
WHS Reg s.299 Compliant Editable Word Format Instant Download
See a sample document →

Also Available As

More SWMS Documents for Electrical / HVAC / Solar

5+ packs delivered to Australian tradies
$67.96 Buy Now