Solar Panel Installation (Ground Mount) — Safe Work Method Statement
Safe work procedures for ground-mounted photovoltaic solar panel system installation including footing excavation, frame erection, panel mounting, and DC/AC electrical connections.
5 work steps
6 hazards identified
6 control measures
5×5 risk matrix
Worker sign-off section
High-Risk Activity Categories
Electrical Work
Excavation
Legislation Referenced
WHS Reg 2011, Reg 147 (electrical work)
WHS Reg 2011, Reg 306 (excavation)
WHS Reg 2011, Reg 291 (SWMS for high risk)
PPE Requirements
Hard hat (AS/NZS 1801)
Safety glasses (AS/NZS 1337.1)
Insulated gloves (1000 V DC rated) (AS/NZS 2225)
High-visibility vest (AS/NZS 4602.1)
Safety footwear (AS/NZS 2210.3)
Rigger gloves (AS/NZS 2161.3)
Australian Standards Referenced
AS/NZS 5033 — Installation and safety requirements for photovoltaic (PV) arrays
AS/NZS 3000 — Wiring Rules
AS/NZS 3008 — Electrical installations – Selection of cables
AS/NZS 1170.2 — Structural design actions – Wind actions
AS/NZS 2225 — Insulating gloves for electrical purposes
$16.96
$19.95
15% off
Buy This Document
Buy Complete Electrical / HVAC / Solar Pack — Save $81
WHS Reg s.299 Compliant
Editable Word Format
Instant Download
See a sample document →
Also Available As
More JSA Documents for Electrical / HVAC / Solar
$16.96
Buy Now