Solar Panel Installation (Ground Mount) — Safe Work Method Statement

Safe work procedures for ground-mounted photovoltaic solar panel system installation including footing excavation, frame erection, panel mounting, and DC/AC electrical connections.

5 work steps 6 hazards identified 6 control measures 5×5 risk matrix Worker sign-off section

High-Risk Activity Categories

Electrical Work Excavation

Legislation Referenced

WHS Reg 2011, Reg 147 (electrical work) WHS Reg 2011, Reg 306 (excavation) WHS Reg 2011, Reg 291 (SWMS for high risk)

PPE Requirements

Hard hat (AS/NZS 1801) Safety glasses (AS/NZS 1337.1) Insulated gloves (1000 V DC rated) (AS/NZS 2225) High-visibility vest (AS/NZS 4602.1) Safety footwear (AS/NZS 2210.3) Rigger gloves (AS/NZS 2161.3)

Australian Standards Referenced

AS/NZS 5033 — Installation and safety requirements for photovoltaic (PV) arrays AS/NZS 3000 — Wiring Rules AS/NZS 3008 — Electrical installations – Selection of cables AS/NZS 1170.2 — Structural design actions – Wind actions AS/NZS 2225 — Insulating gloves for electrical purposes
$67.96 $79.95 15% off
Buy This Document Buy Complete Electrical / HVAC / Solar Pack — Save $374
WHS Reg s.299 Compliant Editable Word Format Instant Download
See a sample document →

Also Available As

More SWMS Documents for Electrical / HVAC / Solar

5+ packs delivered to Australian tradies
$67.96 Buy Now