Underground Cable Laying — Safe Work Method Statement
Safe work procedures for the excavation and laying of underground electrical cables including trenching, conduit installation, cable pulling, backfilling, and jointing for residential and commercial power supply.
5 work steps
6 hazards identified
6 control measures
5×5 risk matrix
Worker sign-off section
High-Risk Activity Categories
Excavation
Electrical Work
Legislation Referenced
WHS Reg 2011, Reg 306 (excavation)
WHS Reg 2011, Reg 147 (electrical work)
WHS Reg 2011, Reg 291 (SWMS for high risk)
PPE Requirements
Hard hat (AS/NZS 1801)
High-visibility vest (AS/NZS 4602.1)
Safety footwear (AS/NZS 2210.3)
Insulated gloves (AS/NZS 2225)
Hearing protection (AS/NZS 1270)
Safety glasses (AS/NZS 1337.1)
Australian Standards Referenced
AS/NZS 3000 — Wiring Rules
AS/NZS 3008 — Electrical installations – Selection of cables
AS/NZS 3012 — Electrical installations – Construction and demolition sites
Safe Work Australia Code of Practice — Excavation work
$16.96
$19.95
15% off
Buy This Document
Buy Complete Electrical / HVAC / Solar Pack — Save $81
WHS Reg s.299 Compliant
Editable Word Format
Instant Download
See a sample document →
Also Available As
More JSA Documents for Electrical / HVAC / Solar
$16.96
Buy Now