Ventilation System Installation — Safe Work Method Statement

Safe work procedures for installing mechanical ventilation systems including exhaust fans, ducted ventilation, heat recovery ventilators, and range hoods in residential and commercial buildings.

5 work steps 6 hazards identified 6 control measures 5×5 risk matrix Worker sign-off section

High-Risk Activity Categories

Electrical Work Work At Height

Legislation Referenced

WHS Reg 2011, Reg 147 (electrical work) WHS Reg 2011, Reg 78 (falls)

PPE Requirements

Safety glasses (AS/NZS 1337.1) P1 disposable respirator (AS/NZS 1716) Cut-resistant gloves (AS/NZS 2161.3) Insulated gloves (AS/NZS 2225) Safety footwear (AS/NZS 2210.3) Full body harness (height work) (AS/NZS 1891.1)

Australian Standards Referenced

AS 1668.2 — The use of ventilation and airconditioning in buildings – Mechanical ventilation in buildings AS/NZS 3000 — Wiring Rules AS/NZS 1891.1 — Industrial fall-arrest systems and devices AS/NZS 1716 — Respiratory protective devices
$16.96 $19.95 15% off
Buy This Document Buy Complete Electrical / HVAC / Solar Pack — Save $81
WHS Reg s.299 Compliant Editable Word Format Instant Download
See a sample document →

Also Available As

More JSA Documents for Electrical / HVAC / Solar

5+ packs delivered to Australian tradies
$16.96 Buy Now