SOP — Lightning Protection System Installation

5 work steps 0 hazards identified 0 control measures 5×5 risk matrix Worker sign-off section

PPE Requirements

Full body harness with energy absorbing lanyard (AS/NZS 1891.1) Hard hat (AS/NZS 1801) Insulated gloves (AS/NZS 2225) Safety glasses (AS/NZS 1337.1) Safety footwear (AS/NZS 2210.3) Hearing protection (AS/NZS 1270)

Australian Standards Referenced

AS/NZS 1768 — Lightning protection AS/NZS 3000 — Wiring Rules AS/NZS 1891.1 — Industrial fall-arrest systems and devices AS/NZS 2225 — Insulating gloves for electrical purposes
$33.96 $39.95 15% off
Buy This Document Buy Complete Electrical / HVAC / Solar Pack — Save $161
WHS Reg s.299 Compliant Editable Word Format Instant Download
See a sample document →

Also Available As

More SOP Documents for Electrical / HVAC / Solar

5+ packs delivered to Australian tradies
$33.96 Buy Now