Lightning Protection System Installation — Safe Work Method Statement
Safe work procedures for the design and installation of lightning protection systems including air terminals, down conductors, earth termination systems, and surge protection devices per AS/NZS 1768.
5 work steps
6 hazards identified
6 control measures
5×5 risk matrix
Worker sign-off section
High-Risk Activity Categories
Work At Height
Electrical Work
Legislation Referenced
WHS Reg 2011, Reg 78 (falls)
WHS Reg 2011, Reg 147 (electrical work)
WHS Reg 2011, Reg 291 (SWMS for high risk)
PPE Requirements
Full body harness with energy absorbing lanyard (AS/NZS 1891.1)
Hard hat (AS/NZS 1801)
Insulated gloves (AS/NZS 2225)
Safety glasses (AS/NZS 1337.1)
Safety footwear (AS/NZS 2210.3)
Hearing protection (AS/NZS 1270)
Australian Standards Referenced
AS/NZS 1768 — Lightning protection
AS/NZS 3000 — Wiring Rules
AS/NZS 1891.1 — Industrial fall-arrest systems and devices
AS/NZS 2225 — Insulating gloves for electrical purposes
$67.96
$79.95
15% off
Buy This Document
Buy Complete Electrical / HVAC / Solar Pack — Save $374
WHS Reg s.299 Compliant
Editable Word Format
Instant Download
See a sample document →
Also Available As
More SWMS Documents for Electrical / HVAC / Solar
$67.96
Buy Now