Lightning Protection System Installation — Safe Work Method Statement

Safe work procedures for the design and installation of lightning protection systems including air terminals, down conductors, earth termination systems, and surge protection devices per AS/NZS 1768.

5 work steps 6 hazards identified 6 control measures 5×5 risk matrix Worker sign-off section

High-Risk Activity Categories

Work At Height Electrical Work

Legislation Referenced

WHS Reg 2011, Reg 78 (falls) WHS Reg 2011, Reg 147 (electrical work) WHS Reg 2011, Reg 291 (SWMS for high risk)

PPE Requirements

Full body harness with energy absorbing lanyard (AS/NZS 1891.1) Hard hat (AS/NZS 1801) Insulated gloves (AS/NZS 2225) Safety glasses (AS/NZS 1337.1) Safety footwear (AS/NZS 2210.3) Hearing protection (AS/NZS 1270)

Australian Standards Referenced

AS/NZS 1768 — Lightning protection AS/NZS 3000 — Wiring Rules AS/NZS 1891.1 — Industrial fall-arrest systems and devices AS/NZS 2225 — Insulating gloves for electrical purposes
$67.96 $79.95 15% off
Buy This Document Buy Complete Electrical / HVAC / Solar Pack — Save $374
WHS Reg s.299 Compliant Editable Word Format Instant Download
See a sample document →

Also Available As

More SWMS Documents for Electrical / HVAC / Solar

5+ packs delivered to Australian tradies
$67.96 Buy Now