Landscaping Risk Assessment

Earthworks, retaining walls, irrigation, paving, and tree work

Landscaping Risk Assessment

One document — covers landscaping for this product type.

Not the right fit? Refund available if documents don't match your trade.

Not sure your current documents are compliant? Run the free WHS compliance check →

Also available for Landscaping: SWMS — from $67.95 JSA — from $16.95 Toolbox Talk — from $20.95 Induction — from $20.95 SOP — from $33.95 Emergency — from $41.95

Landscaping work involves high-risk activities including excavation, working near underground services, operating powered mobile plant (excavators, skid steers), and tree work at height — all requiring SWMS under WHS Regulations s.291.

Our landscaping SWMS pack covers 10 activities including earthworks and excavation, retaining wall construction, irrigation system installation, paving and concreting, tree removal and pruning, garden bed construction, turf laying, and plant/equipment operations. Documents address hazards such as trench collapse, underground service strikes, chainsaw injuries, plant-pedestrian interactions, and manual handling of heavy materials.

Key Hazards Covered
Relevant Australian Standards

Individual Documents — $33.95 each

Document Price
Site-Specific Risk Assessment
What's inside this document
7 checklist categories 2 legislation references Hazard register included
Legislation Referenced WHS Reg s.299(3)(a)(i) - site-specific considerations WHS Act s.17-19 - general duty of care
$33.95

Landscaping Risk Assessment — Common Questions

What is the difference between a risk assessment and a SWMS?

A risk assessment provides a broad overview of all hazards for a scope of work at a site. A SWMS is task-specific and legally required for high-risk construction work. Both are important but serve different purposes.

Do I need a risk assessment if I have a SWMS?

Yes. A SWMS covers specific high-risk tasks. A site-specific risk assessment covers all hazards at the site, including those not classified as high-risk construction work.

What risk matrix do your assessments use?

Our risk assessments use a 5×5 likelihood-consequence matrix, providing initial risk ratings before controls and residual ratings after controls are applied.

Last updated: March 2026