Carpentry Risk Assessment
Framing, formwork, trusses, decking, fit-out, and heights
Carpentry Risk Assessment
One document — covers carpentry for this product type.
Not sure your current documents are compliant? Run the free WHS compliance check →
Carpentry work frequently involves high-risk construction activities under WHS Regulations s.291, including working at heights of 2 metres or more during framing, truss installation, and roof fit-out. A SWMS is legally required before commencing these activities.
Our carpentry SWMS pack covers 10 critical work activities including structural framing, formwork construction, roof truss installation, timber decking, internal fit-out, and working at heights. Each document identifies trade-specific hazards such as falls from incomplete structures, manual handling of heavy timber, power tool injuries, and falling objects.
Key Hazards Covered
- Falls from height during framing and truss work
- Manual handling of heavy timber and sheet materials
- Power tool injuries (circular saws, nail guns)
- Struck by falling objects or materials
- Working near unprotected edges and openings
- Musculoskeletal injuries from repetitive tasks
Relevant Australian Standards
- AS/NZS 1891.1 Industrial fall-arrest systems
- AS 1684 Residential timber-framed construction
- AS/NZS 4994.1 Temporary edge protection
- AS/NZS 1576 Scaffolding
Individual Documents — $33.95 each
Carpentry Risk Assessment — Common Questions
What is the difference between a risk assessment and a SWMS?
A risk assessment provides a broad overview of all hazards for a scope of work at a site. A SWMS is task-specific and legally required for high-risk construction work. Both are important but serve different purposes.
Do I need a risk assessment if I have a SWMS?
Yes. A SWMS covers specific high-risk tasks. A site-specific risk assessment covers all hazards at the site, including those not classified as high-risk construction work.
What risk matrix do your assessments use?
Our risk assessments use a 5×5 likelihood-consequence matrix, providing initial risk ratings before controls and residual ratings after controls are applied.