Carpentry Risk Assessment

Framing, formwork, trusses, decking, fit-out, and heights

Carpentry Risk Assessment

One document — covers carpentry for this product type.

Not the right fit? Refund available if documents don't match your trade.

Not sure your current documents are compliant? Run the free WHS compliance check →

Also available for Carpentry: SWMS — from $67.95 JSA — from $16.95 Toolbox Talk — from $20.95 Induction — from $20.95 SOP — from $33.95 Emergency — from $41.95

Carpentry work frequently involves high-risk construction activities under WHS Regulations s.291, including working at heights of 2 metres or more during framing, truss installation, and roof fit-out. A SWMS is legally required before commencing these activities.

Our carpentry SWMS pack covers 10 critical work activities including structural framing, formwork construction, roof truss installation, timber decking, internal fit-out, and working at heights. Each document identifies trade-specific hazards such as falls from incomplete structures, manual handling of heavy timber, power tool injuries, and falling objects.

Key Hazards Covered
Relevant Australian Standards

Individual Documents — $33.95 each

Document Price
Site-Specific Risk Assessment
What's inside this document
7 checklist categories 2 legislation references Hazard register included
Legislation Referenced WHS Reg s.299(3)(a)(i) - site-specific considerations WHS Act s.17-19 - general duty of care
$33.95

Carpentry Risk Assessment — Common Questions

What is the difference between a risk assessment and a SWMS?

A risk assessment provides a broad overview of all hazards for a scope of work at a site. A SWMS is task-specific and legally required for high-risk construction work. Both are important but serve different purposes.

Do I need a risk assessment if I have a SWMS?

Yes. A SWMS covers specific high-risk tasks. A site-specific risk assessment covers all hazards at the site, including those not classified as high-risk construction work.

What risk matrix do your assessments use?

Our risk assessments use a 5×5 likelihood-consequence matrix, providing initial risk ratings before controls and residual ratings after controls are applied.

Last updated: March 2026