Solid Plastering/Render (External with Scaffold) — Safe Work Method Statement

Covers external solid plastering and rendering operations from scaffold systems including cement render, acrylic render and texture coat application to external wall surfaces. Addresses fall hazards from scaffold, cement dust and chemical exposure, UV and heat stress, manual handling of materials at height, and adverse weather impacts on render application.

5 work steps 8 hazards identified 8 control measures 5×5 risk matrix Worker sign-off section

High-Risk Activity Categories

Working At Heights

Legislation Referenced

WHS Reg 2011, Reg 291(1)(a) - Risk of fall of 2m or more WHS Reg 2011, Part 3.1 - Managing risks to health and safety WHS Reg 2011, Reg 351 - Managing risks of hazardous chemicals WHS Reg 2011, Reg 60 - Hazardous manual tasks

PPE Requirements

P2 respirator (cement dust) (AS/NZS 1716) Safety goggles (AS/NZS 1337.1) Alkali-resistant gloves (AS/NZS 2161.10) Non-slip sole safety boots (AS/NZS 2210.3) Full body harness (secondary protection) (AS/NZS 1891.1) Hard hat (ground personnel) (AS/NZS 1801) Hi-visibility vest (AS/NZS 4602.1) Sun protection (hat, SPF 50+ sunscreen) (N/A) Hearing protection (pump/mixer) (AS/NZS 1270)

Australian Standards Referenced

AS/NZS 4576 — Guidelines for Scaffolding Safety AS/NZS 1891.1 — Industrial Fall-Arrest Systems — Harnesses and Ancillary Equipment AS 3700 — Masonry Structures AS/NZS 1716 — Respiratory Protective Devices AS/NZS 1337.1 — Personal Eye Protection AS/NZS 2161.10 — Occupational Protective Gloves — Protective Gloves Against Chemicals and Micro-Organisms AS/NZS 1801 — Occupational Protective Helmets
$67.96 $79.95 15% off
Buy This Document Buy Complete Plastering Pack — Save $52
WHS Reg s.299 Compliant Editable Word Format Instant Download
See a sample document →

Also Available As

More SWMS Documents for Plastering

5+ packs delivered to Australian tradies
$67.96 Buy Now