Pipe Welding and Brazing — Job Safety Analysis

Safe work procedures for welding, brazing, and soldering of plumbing pipework including copper, steel, and stainless steel pipes, with fire prevention and fume management controls.

A Job Safety Analysis (JSA) breaks each work task into steps, identifies hazards at each step, and lists practical control measures. Unlike a full SWMS, a JSA is a streamlined tool ideal for daily pre-start meetings, toolbox talks, and routine risk assessments. Our JSA documents are built from the same hazard data as our SWMS, ensuring consistency across your safety documentation. Each JSA includes risk ratings and references to relevant Australian Standards.

A JSA does not replace a SWMS where one is legally required. This activity falls under high-risk construction work, so a Safe Work Method Statement is required under the WHS Regulations in addition to this JSA. See the Plumbing SWMS for this task →
5 work steps 9 hazards identified 9 control measures 6 PPE items specified 4 AS/NZS standards cited 5×5 risk matrix Worker sign-off section

Legislation Referenced

WHS Reg 2011, Reg 60 — manual tasks WHS Reg 2011, Reg 50 — hazardous atmospheres

PPE Requirements

Welding helmet (auto-darkening) (AS/NZS 1338.1) Leather welding gloves (AS/NZS 2161.3) Leather apron or welding jacket (General duty) Safety footwear with gaiters (AS/NZS 2210.3) Half-face respirator with P2/OV (AS/NZS 1716) Hearing protection (AS/NZS 1270)

Australian Standards Referenced

AS 4041 — Pressure piping AS/NZS 1554.1 — Structural steel welding — Welding of steel structures AS/NZS 1338.1 — Filters for eye protectors — Welding and related operations AS/NZS 1716 — Respiratory protective devices
$16.95
Buy This Document Buy Complete Plumbing Pack — Save $97
WHS Legislation Referenced Editable Word Format Instant Download
See a sample document →

Not sure your existing jsa is compliant? Run the free WHS compliance check →

Also Available As

Using This JSA On Site

Work through the JSA at the start of the shift, in front of the crew, before the task begins. Read the steps out, confirm the controls are actually in place that day, write anything site-specific into the blank rows, and have everyone sign on. Keep it alongside your SWMS rather than instead of it.

JSA — Common Questions

What is the difference between a JSA and a SWMS?

A SWMS is a legal requirement for high-risk construction work and must include detailed control measures and worker sign-off. A JSA is a simplified hazard analysis used for daily planning, toolbox meetings, and non-HRCW tasks. Many businesses use both.

When should I use a JSA?

Use a JSA for daily pre-start meetings, when introducing new workers to a task, for non-high-risk activities, or as a quick reference during toolbox talks.

Can a JSA replace a SWMS?

No. If the work is classified as high-risk construction work under WHS Regulations, a SWMS is legally required. A JSA complements a SWMS but cannot replace it for HRCW.

More JSA Documents for Plumbing

Not the right fit? Refund available if the document doesn't match your trade.
$16.95 Buy Now