Pipe Welding and Brazing — Safe Work Method Statement

Safe work procedures for welding, brazing, and soldering of plumbing pipework including copper, steel, and stainless steel pipes, with fire prevention and fume management controls.

A Safe Work Method Statement (SWMS) is a legal requirement under WHS Regulations for any high-risk construction work in Australia. It identifies hazards, assesses risks using a 5×5 matrix, and sets out control measures following the hierarchy of controls. Our SWMS documents reference specific WHS Regulation clauses and AS/NZS standards for every piece of PPE, giving you audit-ready documentation that satisfies regulator requirements in every state and territory.

5 work steps 9 hazards identified 9 control measures 6 PPE items specified 4 AS/NZS standards cited 5×5 risk matrix Worker sign-off section

High-Risk Activity Categories

Hazardous Atmosphere

Legislation Referenced

WHS Reg 2011, Reg 60 — manual tasks WHS Reg 2011, Reg 50 — hazardous atmospheres

PPE Requirements

Welding helmet (auto-darkening) (AS/NZS 1338.1) Leather welding gloves (AS/NZS 2161.3) Leather apron or welding jacket (General duty) Safety footwear with gaiters (AS/NZS 2210.3) Half-face respirator with P2/OV (AS/NZS 1716) Hearing protection (AS/NZS 1270)

Australian Standards Referenced

AS 4041 — Pressure piping AS/NZS 1554.1 — Structural steel welding — Welding of steel structures AS/NZS 1338.1 — Filters for eye protectors — Welding and related operations AS/NZS 1716 — Respiratory protective devices
$67.95
Buy This Document Buy Complete Plumbing Pack — Save $459
WHS Reg s.299 Compliant Editable Word Format Instant Download
See a sample document →

Not sure your existing swms is compliant? Run the free WHS compliance check →

Also Available As

Using This SWMS On Site

Keep the SWMS where the work is being carried out and have it available if the principal contractor asks for it. Workers named on it sign the acknowledgement page before starting, and it gets reviewed whenever the method, the site conditions or the crew change.

SWMS — Common Questions

When is a SWMS legally required?

Under WHS Regulation 299, a SWMS must be prepared before any high-risk construction work (HRCW) begins. This includes work at heights, demolition, work near energised electrical, excavation over 1.5m, and 18 other defined activities.

What should a SWMS include?

A compliant SWMS must identify the high-risk work, list hazards and risks, describe control measures using the hierarchy of controls, and be signed by the workers involved. Our documents include all required elements plus specific legislation references.

Who needs to sign a SWMS?

The PCBU (or employer in Victoria) who commissions the work, and every worker carrying out the high-risk construction work, must sign the SWMS before work begins.

More SWMS Documents for Plumbing

Not the right fit? Refund available if the document doesn't match your trade.
$67.95 Buy Now