Painting Risk Assessment

Interior, exterior, lead paint, spray painting, and heights

Painting Risk Assessment

One document — covers painting for this product type.

Not the right fit? Refund available if documents don't match your trade.

Not sure your current documents are compliant? Run the free WHS compliance check →

Also available for Painting: SWMS — from $67.95 JSA — from $16.95 Toolbox Talk — from $20.95 Induction — from $20.95 SOP — from $33.95 Emergency — from $41.95

Painting work becomes high-risk construction work under WHS Regulations s.291 when it involves working at heights of 2 metres or more, working with lead paint, or spray painting in confined areas.

Our painting SWMS pack covers 10 activities including interior painting, exterior painting at heights, lead paint removal, spray painting operations, surface preparation, and working from ladders, scaffolding, and elevated work platforms. Documents address hazards such as falls from height, chemical exposure from paints and solvents, lead dust inhalation, and fire risk from flammable coatings.

Key Hazards Covered
Relevant Australian Standards

Individual Documents — $33.95 each

Document Price
Site-Specific Risk Assessment
What's inside this document
7 checklist categories 2 legislation references Hazard register included
Legislation Referenced WHS Reg s.299(3)(a)(i) - site-specific considerations WHS Act s.17-19 - general duty of care
$33.95

Painting Risk Assessment — Common Questions

What is the difference between a risk assessment and a SWMS?

A risk assessment provides a broad overview of all hazards for a scope of work at a site. A SWMS is task-specific and legally required for high-risk construction work. Both are important but serve different purposes.

Do I need a risk assessment if I have a SWMS?

Yes. A SWMS covers specific high-risk tasks. A site-specific risk assessment covers all hazards at the site, including those not classified as high-risk construction work.

What risk matrix do your assessments use?

Our risk assessments use a 5×5 likelihood-consequence matrix, providing initial risk ratings before controls and residual ratings after controls are applied.