Plasterboard Installation (Ceilings) — Safe Work Method Statement
Covers the installation of plasterboard ceiling linings including ceiling frame preparation, sheet lifting and fixing overhead, jointing and sanding. Addresses significant manual handling risks from overhead lifting of heavy sheets, musculoskeletal strain from sustained overhead work, working from scaffold platforms, and dust exposure.
5 work steps
8 hazards identified
8 control measures
5×5 risk matrix
Worker sign-off section
High-Risk Activity Categories
Hazardous Chemicals
Legislation Referenced
WHS Reg 2011, Part 3.1 - Managing risks to health and safety
WHS Reg 2011, Reg 60 - Hazardous manual tasks
WHS Reg 2011, Reg 39 - Provision of information, training and instruction
WHS Reg 2011, Reg 351 - Hazardous chemicals
PPE Requirements
P2 respirator (cutting/sanding) (AS/NZS 1716)
Safety goggles (dust-tight) (AS/NZS 1337.1)
Hearing protection (Class 5) (AS/NZS 1270)
Hard hat (AS/NZS 1801)
Steel-cap safety boots (AS/NZS 2210.3)
Riggers gloves (AS/NZS 2161.3)
Australian Standards Referenced
AS/NZS 2589 — Gypsum Linings — Application and Finishing
AS/NZS 2588 — Gypsum Plasterboard
AS/NZS 1716 — Respiratory Protective Devices
AS/NZS 1337.1 — Personal Eye Protection
AS/NZS 1270 — Acoustics — Hearing Protectors
AS/NZS 1801 — Occupational Protective Helmets
$67.96
$79.95
15% off
Buy This Document
Buy Complete Plastering Pack — Save $52
WHS Reg s.299 Compliant
Editable Word Format
Instant Download
See a sample document →
Also Available As
More SWMS Documents for Plastering
$67.96
Buy Now