Plasterboard Installation (Walls) — Safe Work Method Statement

Covers the installation of plasterboard wall linings including stud preparation, sheet cutting, lifting, fixing, jointing and finishing in accordance with AS/NZS 2589. Addresses manual handling of heavy sheets, dust from cutting and sanding, noise from screw guns, and electrical hazards from concealed wiring.

A Safe Work Method Statement (SWMS) is a legal requirement under WHS Regulations for any high-risk construction work in Australia. It identifies hazards, assesses risks using a 5×5 matrix, and sets out control measures following the hierarchy of controls. Our SWMS documents reference specific WHS Regulation clauses and AS/NZS standards for every piece of PPE, giving you audit-ready documentation that satisfies regulator requirements in every state and territory.

5 work steps 8 hazards identified 8 control measures 6 PPE items specified 6 AS/NZS standards cited 5×5 risk matrix Worker sign-off section

High-Risk Activity Categories

Energised Electrical

Legislation Referenced

WHS Reg 2011, Part 3.1 - Managing risks to health and safety WHS Reg 2011, Reg 39 - Provision of information, training and instruction WHS Reg 2011, Reg 49 - Duties of workers WHS Reg 2011, Reg 291(1)(k) - Work on or near energised electrical installations

PPE Requirements

P2 respirator (cutting/sanding) (AS/NZS 1716) Safety glasses / goggles (AS/NZS 1337.1) Hearing protection (Class 5) (AS/NZS 1270) Steel-cap safety boots (AS/NZS 2210.3) Riggers gloves (handling) (AS/NZS 2161.3) Nitrile gloves (jointing compound) (AS/NZS 2161.10)

Australian Standards Referenced

AS/NZS 2589 — Gypsum Linings — Application and Finishing AS/NZS 2588 — Gypsum Plasterboard AS/NZS 3000 — Wiring Rules (cable clearance requirements) AS/NZS 1716 — Respiratory Protective Devices AS/NZS 1270 — Acoustics — Hearing Protectors AS/NZS 1337.1 — Personal Eye Protection
$67.95
Buy This Document Buy Complete Plastering Pack — Save $52
WHS Reg s.299 Compliant Editable Word Format Instant Download
See a sample document →

Not sure your existing swms is compliant? Run the free WHS compliance check →

Also Available As

Using This SWMS On Site

Keep the SWMS where the work is being carried out and have it available if the principal contractor asks for it. Workers named on it sign the acknowledgement page before starting, and it gets reviewed whenever the method, the site conditions or the crew change.

SWMS — Common Questions

When is a SWMS legally required?

Under WHS Regulation 299, a SWMS must be prepared before any high-risk construction work (HRCW) begins. This includes work at heights, demolition, work near energised electrical, excavation over 1.5m, and 18 other defined activities.

What should a SWMS include?

A compliant SWMS must identify the high-risk work, list hazards and risks, describe control measures using the hierarchy of controls, and be signed by the workers involved. Our documents include all required elements plus specific legislation references.

Who needs to sign a SWMS?

The PCBU (or employer in Victoria) who commissions the work, and every worker carrying out the high-risk construction work, must sign the SWMS before work begins.