Wet Area Plasterboard Installation — Safe Work Method Statement

Covers the installation of moisture-resistant plasterboard in wet areas including bathrooms, laundries, kitchens and ensuites. Addresses correct use of water-resistant board, waterproofing membrane interface requirements per AS/NZS 4858, wet area flashing and sealing, and the additional hazards of working in confined wet area spaces.

A Safe Work Method Statement (SWMS) is a legal requirement under WHS Regulations for any high-risk construction work in Australia. It identifies hazards, assesses risks using a 5×5 matrix, and sets out control measures following the hierarchy of controls. Our SWMS documents reference specific WHS Regulation clauses and AS/NZS standards for every piece of PPE, giving you audit-ready documentation that satisfies regulator requirements in every state and territory.

5 work steps 6 hazards identified 6 control measures 6 PPE items specified 6 AS/NZS standards cited 5×5 risk matrix Worker sign-off section

High-Risk Activity Categories

Hazardous Chemicals

Legislation Referenced

WHS Reg 2011, Part 3.1 - Managing risks to health and safety WHS Reg 2011, Reg 351 - Managing risks of hazardous chemicals WHS Reg 2011, Reg 39 - Provision of information, training and instruction WHS Reg 2011, Reg 351 - Hazardous chemicals

PPE Requirements

P2 respirator (cutting/sanding) (AS/NZS 1716) Safety goggles (dust-tight) (AS/NZS 1337.1) Hearing protection (AS/NZS 1270) Non-slip sole safety boots (AS/NZS 2210.3) Riggers gloves (AS/NZS 2161.3) Nitrile gloves (chemicals) (AS/NZS 2161.10)

Australian Standards Referenced

AS/NZS 2589 — Gypsum Linings — Application and Finishing AS/NZS 2588 — Gypsum Plasterboard AS/NZS 4858 — Wet Area Waterproofing — Design and Installation AS 3740 — Waterproofing of Domestic Wet Areas AS/NZS 1716 — Respiratory Protective Devices AS/NZS 1337.1 — Personal Eye Protection
$67.95
Buy This Document Buy Complete Plastering Pack — Save $52
WHS Reg s.299 Compliant Editable Word Format Instant Download
See a sample document →

Not sure your existing swms is compliant? Run the free WHS compliance check →

Also Available As

Using This SWMS On Site

Keep the SWMS where the work is being carried out and have it available if the principal contractor asks for it. Workers named on it sign the acknowledgement page before starting, and it gets reviewed whenever the method, the site conditions or the crew change.

SWMS — Common Questions

When is a SWMS legally required?

Under WHS Regulation 299, a SWMS must be prepared before any high-risk construction work (HRCW) begins. This includes work at heights, demolition, work near energised electrical, excavation over 1.5m, and 18 other defined activities.

What should a SWMS include?

A compliant SWMS must identify the high-risk work, list hazards and risks, describe control measures using the hierarchy of controls, and be signed by the workers involved. Our documents include all required elements plus specific legislation references.

Who needs to sign a SWMS?

The PCBU (or employer in Victoria) who commissions the work, and every worker carrying out the high-risk construction work, must sign the SWMS before work begins.

More SWMS Documents for Plastering

Not the right fit? Refund available if the document doesn't match your trade.
$67.95 Buy Now