Civil Works Risk Assessment

Road works, drainage, kerbing, stormwater, and earthmoving

Civil Works Risk Assessment

One document — covers civil works for this product type.

Not the right fit? Refund available if documents don't match your trade.

Not sure your current documents are compliant? Run the free WHS compliance check →

Also available for Civil Works: SWMS — from $67.95 JSA — from $16.95 Toolbox Talk — from $20.95 Induction — from $20.95 SOP — from $33.95 Emergency — from $41.95

Civil construction work involves multiple high-risk activities including excavation, working near traffic, operating heavy plant, and working near underground services — all requiring SWMS under WHS Regulations s.291.

Our civil works SWMS pack covers 12 activities including road works, drainage installation, kerb and gutter construction, stormwater systems, earthmoving operations, and traffic management. Each document addresses hazards specific to civil construction such as trench collapse, underground service strikes, plant-pedestrian interactions, and exposure to traffic.

Key Hazards Covered
Relevant Australian Standards

Individual Documents — $33.95 each

Document Price
Site-Specific Risk Assessment
What's inside this document
7 checklist categories 2 legislation references Hazard register included
Legislation Referenced WHS Reg s.299(3)(a)(i) - site-specific considerations WHS Act s.17-19 - general duty of care
$33.95

Civil Works Risk Assessment — Common Questions

What is the difference between a risk assessment and a SWMS?

A risk assessment provides a broad overview of all hazards for a scope of work at a site. A SWMS is task-specific and legally required for high-risk construction work. Both are important but serve different purposes.

Do I need a risk assessment if I have a SWMS?

Yes. A SWMS covers specific high-risk tasks. A site-specific risk assessment covers all hazards at the site, including those not classified as high-risk construction work.

What risk matrix do your assessments use?

Our risk assessments use a 5×5 likelihood-consequence matrix, providing initial risk ratings before controls and residual ratings after controls are applied.