Electrical / HVAC / Solar Emergency
Electrical rough-in, switchboards, solar, AC, ventilation, and cabling
Electrical / HVAC / Solar Complete Pack
4 documents — everything you need for electrical / hvac / solar compliance.
Not sure your current documents are compliant? Run the free WHS compliance check →
Electrical work near energised electrical installations or services is explicitly classified as high-risk construction work under WHS Regulations s.291(k). This applies to electrical rough-in, switchboard work, solar panel installation, HVAC systems, and data cabling.
Our electrical/HVAC/solar SWMS pack is one of our largest with 19 documents covering electrical rough-in, switchboard installation and upgrade, solar panel mounting and connection, air conditioning installation, ventilation systems, data and communications cabling, and working in roof spaces. Each document addresses critical hazards including electrocution, arc flash, falls from height during solar and HVAC roof work, and working in confined ceiling spaces.
Key Hazards Covered
- Electrocution from energised installations
- Arc flash and electrical burns
- Falls from height during solar and roof work
- Working in confined roof and ceiling spaces
- Manual handling of heavy equipment (AC units, switchboards)
- Refrigerant gas exposure during HVAC work
- Cable pulling injuries
Relevant Australian Standards
- AS/NZS 3000 Wiring rules
- AS/NZS 3008 Electrical installations — Selection of cables
- AS/NZS 5033 Installation and safety requirements for PV arrays
- AS/NZS 1891.1 Fall-arrest systems
- AS/NZS 3823 Performance of electrical appliances — Air conditioners
Individual Documents — $41.95 each
Electrical / HVAC / Solar Emergency — Common Questions
Are emergency procedures a legal requirement?
Yes. Under WHS Regulation 43, PCBUs must prepare, maintain, and implement an emergency plan for the workplace. Workers must be trained in emergency procedures.
What emergencies do your procedures cover?
Our procedures cover trade-specific emergencies including injuries, chemical exposure, fire, electrical incidents, structural collapse, severe weather, and medical emergencies.
Do emergency procedures include notification requirements?
Yes. Each procedure includes who to notify (emergency services, regulators, site managers), when to notify them, and what information to provide.
Last updated: March 2026