Electrical / HVAC / Solar Risk Assessment

Electrical rough-in, switchboards, solar, AC, ventilation, and cabling

Electrical / HVAC / Solar Risk Assessment

One document — covers electrical / hvac / solar for this product type.

Not the right fit? Refund available if documents don't match your trade.

Not sure your current documents are compliant? Run the free WHS compliance check →

Also available for Electrical / HVAC / Solar: SWMS — from $67.95 JSA — from $16.95 Toolbox Talk — from $20.95 Induction — from $20.95 SOP — from $33.95 Emergency — from $41.95

Electrical work near energised electrical installations or services is explicitly classified as high-risk construction work under WHS Regulations s.291(k). This applies to electrical rough-in, switchboard work, solar panel installation, HVAC systems, and data cabling.

Our electrical/HVAC/solar SWMS pack is one of our largest with 19 documents covering electrical rough-in, switchboard installation and upgrade, solar panel mounting and connection, air conditioning installation, ventilation systems, data and communications cabling, and working in roof spaces. Each document addresses critical hazards including electrocution, arc flash, falls from height during solar and HVAC roof work, and working in confined ceiling spaces.

Key Hazards Covered
Relevant Australian Standards

Individual Documents — $33.95 each

Document Price
Site-Specific Risk Assessment
What's inside this document
7 checklist categories 2 legislation references Hazard register included
Legislation Referenced WHS Reg s.299(3)(a)(i) - site-specific considerations WHS Act s.17-19 - general duty of care
$33.95

Electrical / HVAC / Solar Risk Assessment — Common Questions

What is the difference between a risk assessment and a SWMS?

A risk assessment provides a broad overview of all hazards for a scope of work at a site. A SWMS is task-specific and legally required for high-risk construction work. Both are important but serve different purposes.

Do I need a risk assessment if I have a SWMS?

Yes. A SWMS covers specific high-risk tasks. A site-specific risk assessment covers all hazards at the site, including those not classified as high-risk construction work.

What risk matrix do your assessments use?

Our risk assessments use a 5×5 likelihood-consequence matrix, providing initial risk ratings before controls and residual ratings after controls are applied.

Last updated: March 2026