Plastering SOP

Plasterboard, fire-rated systems, rendering, and wet areas

Plastering Complete Pack

8 documents — everything you need for plastering compliance.

Not the right fit? Refund available if documents don't match your trade.

Not sure your current documents are compliant? Run the free WHS compliance check →

Also available for Plastering: SWMS — from $67.95 JSA — from $16.95 Toolbox Talk — from $20.95 Risk Assessment — from $33.95 Induction — from $20.95 Emergency — from $41.95

Plastering work triggers SWMS requirements under WHS Regulations s.291 when performed at heights of 2 metres or more, which is common for ceiling work, stairwells, and multi-storey interiors.

Our plastering SWMS pack covers 8 activities including plasterboard installation, fire-rated wall and ceiling systems, cement rendering, cornice installation, wet area preparation, and working from scaffolding and stilts. Documents address hazards such as falls from stilts and scaffolding, manual handling of heavy plasterboard sheets, dust inhalation from sanding, and chemical exposure from adhesives and compounds.

Key Hazards Covered
Relevant Australian Standards

Individual Documents — $33.95 each

Document Price
SOP — Plasterboard Installation (Walls)
What's inside this document
5 work steps 4 pre-use checks 8 equipment items listed 6 PPE items specified 6 AS/NZS standards cited Worker sign-off section
PPE Requirements (with AS/NZS standards)
P2 respirator (cutting/sanding) (AS/NZS 1716) Safety glasses / goggles (AS/NZS 1337.1) Hearing protection (Class 5) (AS/NZS 1270) Steel-cap safety boots (AS/NZS 2210.3) Riggers gloves (handling) (AS/NZS 2161.3) Nitrile gloves (jointing compound) (AS/NZS 2161.10)
Australian Standards Referenced
AS/NZS 2589 — Gypsum Linings — Application and Finishing AS/NZS 2588 — Gypsum Plasterboard AS/NZS 3000 — Wiring Rules (cable clearance requirements) AS/NZS 1716 — Respiratory Protective Devices AS/NZS 1270 — Acoustics — Hearing Protectors AS/NZS 1337.1 — Personal Eye Protection
$33.95
SOP — Plasterboard Installation (Ceilings)
What's inside this document
5 work steps 4 pre-use checks 8 equipment items listed 6 PPE items specified 6 AS/NZS standards cited Worker sign-off section
PPE Requirements (with AS/NZS standards)
P2 respirator (cutting/sanding) (AS/NZS 1716) Safety goggles (dust-tight) (AS/NZS 1337.1) Hearing protection (Class 5) (AS/NZS 1270) Hard hat (AS/NZS 1801) Steel-cap safety boots (AS/NZS 2210.3) Riggers gloves (AS/NZS 2161.3)
Australian Standards Referenced
AS/NZS 2589 — Gypsum Linings — Application and Finishing AS/NZS 2588 — Gypsum Plasterboard AS/NZS 1716 — Respiratory Protective Devices AS/NZS 1337.1 — Personal Eye Protection AS/NZS 1270 — Acoustics — Hearing Protectors AS/NZS 1801 — Occupational Protective Helmets
$33.95
SOP — Fire-Rated Plasterboard Systems
What's inside this document
5 work steps 4 pre-use checks 8 equipment items listed 6 PPE items specified 6 AS/NZS standards cited Worker sign-off section
PPE Requirements (with AS/NZS standards)
P2 respirator (cutting/sanding) (AS/NZS 1716) Safety goggles (dust-tight) (AS/NZS 1337.1) Hearing protection (Class 5) (AS/NZS 1270) Steel-cap safety boots (AS/NZS 2210.3) Cut-resistant gloves (Level D) (AS/NZS 2161.3) Nitrile gloves (sealants) (AS/NZS 2161.10)
Australian Standards Referenced
AS/NZS 2589 — Gypsum Linings — Application and Finishing AS/NZS 2588 — Gypsum Plasterboard AS 1530.4 — Methods for Fire Tests on Building Materials — Fire Resistance Tests AS 4072.1 — Components for the Protection of Openings in Fire-Resistant Walls — Service Penetrations and Control Joints AS/NZS 1716 — Respiratory Protective Devices AS/NZS 1337.1 — Personal Eye Protection
$33.95
SOP — Wet Area Plasterboard Installation
What's inside this document
5 work steps 4 pre-use checks 8 equipment items listed 6 PPE items specified 6 AS/NZS standards cited Worker sign-off section
PPE Requirements (with AS/NZS standards)
P2 respirator (cutting/sanding) (AS/NZS 1716) Safety goggles (dust-tight) (AS/NZS 1337.1) Hearing protection (AS/NZS 1270) Non-slip sole safety boots (AS/NZS 2210.3) Riggers gloves (AS/NZS 2161.3) Nitrile gloves (chemicals) (AS/NZS 2161.10)
Australian Standards Referenced
AS/NZS 2589 — Gypsum Linings — Application and Finishing AS/NZS 2588 — Gypsum Plasterboard AS/NZS 4858 — Wet Area Waterproofing — Design and Installation AS 3740 — Waterproofing of Domestic Wet Areas AS/NZS 1716 — Respiratory Protective Devices AS/NZS 1337.1 — Personal Eye Protection
$33.95
SOP — Plaster Cornice and Decorative Moulding
What's inside this document
4 work steps 4 pre-use checks 8 equipment items listed 5 PPE items specified 5 AS/NZS standards cited Worker sign-off section
PPE Requirements (with AS/NZS standards)
P2 respirator (cutting/sanding) (AS/NZS 1716) Safety glasses / goggles (AS/NZS 1337.1) Hearing protection (AS/NZS 1270) Non-slip sole safety boots (AS/NZS 2210.3) Nitrile gloves (adhesive) (AS/NZS 2161.10)
Australian Standards Referenced
AS/NZS 2589 — Gypsum Linings — Application and Finishing AS/NZS 4576 — Guidelines for Scaffolding Safety AS/NZS 1716 — Respiratory Protective Devices AS/NZS 1337.1 — Personal Eye Protection AS/NZS 1270 — Acoustics — Hearing Protectors
$33.95
SOP — Solid Plastering/Render (Internal)
What's inside this document
5 work steps 4 pre-use checks 8 equipment items listed 6 PPE items specified 5 AS/NZS standards cited Worker sign-off section
PPE Requirements (with AS/NZS standards)
P2 respirator (cement dust) (AS/NZS 1716) Safety glasses / goggles (AS/NZS 1337.1) Alkali-resistant gloves (AS/NZS 2161.10) Cut-resistant gloves (metal beads) (AS/NZS 2161.3) Waterproof / steel-cap safety boots (AS/NZS 2210.3) Hearing protection (mixer/pump) (AS/NZS 1270)
Australian Standards Referenced
AS/NZS 2589 — Gypsum Linings — Application and Finishing AS 3700 — Masonry Structures AS/NZS 1716 — Respiratory Protective Devices AS/NZS 1337.1 — Personal Eye Protection AS/NZS 2161.10 — Occupational Protective Gloves — Protective Gloves Against Chemicals and Micro-Organisms
$33.95
SOP — Solid Plastering/Render (External with Scaffold)
What's inside this document
5 work steps 4 pre-use checks 8 equipment items listed 9 PPE items specified 7 AS/NZS standards cited Worker sign-off section
PPE Requirements (with AS/NZS standards)
P2 respirator (cement dust) (AS/NZS 1716) Safety goggles (AS/NZS 1337.1) Alkali-resistant gloves (AS/NZS 2161.10) Non-slip sole safety boots (AS/NZS 2210.3) Full body harness (secondary protection) (AS/NZS 1891.1) Hard hat (ground personnel) (AS/NZS 1801) Hi-visibility vest (AS/NZS 4602.1) Sun protection (hat, SPF 50+ sunscreen) (N/A) Hearing protection (pump/mixer) (AS/NZS 1270)
Australian Standards Referenced
AS/NZS 4576 — Guidelines for Scaffolding Safety AS/NZS 1891.1 — Industrial Fall-Arrest Systems — Harnesses and Ancillary Equipment AS 3700 — Masonry Structures AS/NZS 1716 — Respiratory Protective Devices AS/NZS 1337.1 — Personal Eye Protection AS/NZS 2161.10 — Occupational Protective Gloves — Protective Gloves Against Chemicals and Micro-Organisms AS/NZS 1801 — Occupational Protective Helmets
$33.95
SOP — Plasterboard Repair and Patching
What's inside this document
5 work steps 4 pre-use checks 8 equipment items listed 5 PPE items specified 5 AS/NZS standards cited Worker sign-off section
PPE Requirements (with AS/NZS standards)
P2 respirator (AS/NZS 1716) Safety glasses / goggles (AS/NZS 1337.1) Non-slip sole safety boots (AS/NZS 2210.3) Nitrile gloves (AS/NZS 2161.10) Hearing protection (power tools) (AS/NZS 1270)
Australian Standards Referenced
AS/NZS 2589 — Gypsum Linings — Application and Finishing AS/NZS 2588 — Gypsum Plasterboard AS/NZS 3000 — Wiring Rules (cable clearance requirements) AS/NZS 1716 — Respiratory Protective Devices AS/NZS 1337.1 — Personal Eye Protection
$33.95

Plastering SOP — Common Questions

What is the difference between a SOP and a SWMS?

A SOP provides step-by-step instructions for completing a task safely. A SWMS is a legal document specifically for high-risk construction work that focuses on hazard identification and risk control. SOPs are broader and apply to all tasks, not just HRCW.

Why do I need SOPs if I have SWMS?

SWMS only cover high-risk construction work. SOPs cover all tasks, including routine operations, equipment use, and procedures that don't qualify as HRCW but still need standardised safe practices.

Are your SOPs trade-specific?

Yes. Each SOP is written for specific trade activities, with relevant safety controls, PPE requirements, and references to applicable Australian Standards.

Last updated: March 2026