Swimming Pool Construction Emergency

Pool excavation, steel fixing, plumbing, tiling, and pool fencing

Swimming Pool Construction Complete Pack

3 documents — everything you need for swimming pool construction compliance.

Not the right fit? Refund available if documents don't match your trade.

Not sure your current documents are compliant? Run the free WHS compliance check →

Also available for Swimming Pool Construction: SWMS — from $67.95 JSA — from $16.95 Toolbox Talk — from $20.95 Risk Assessment — from $33.95 Induction — from $20.95 SOP — from $33.95

Swimming pool construction involves multiple high-risk activities including excavation deeper than 1.5 metres, working in confined spaces (pool shells), steel fixing, crane operations for precast pools, and plumbing near underground services.

Our swimming pool SWMS pack covers 8 activities including pool excavation, steel reinforcement fixing, concrete pool shell construction, fibreglass pool installation (crane lifting), pool plumbing and filtration, pool tiling, pool fencing, and pool coping and paving. Documents address hazards such as excavation collapse, crane operations, working in confined pool shells, underground service strikes, and drowning risk during water testing.

Key Hazards Covered
Relevant Australian Standards

Individual Documents — $41.95 each

Document Price
Emergency Procedure — Serious Injury
What's inside this document
5 immediate actions 4 first aid steps 4 notification requirements 1 standards referenced Emergency contact table
Australian Standards Referenced
AS 3745 — Planning for emergencies in facilities
$41.95
Emergency Procedure — Fire
What's inside this document
5 immediate actions 4 first aid steps 4 notification requirements 2 standards referenced Emergency contact table
Australian Standards Referenced
AS 3745 AS 2444 — Portable fire extinguishers
$41.95
Emergency Procedure — Fall from Height
What's inside this document
5 immediate actions 4 first aid steps 4 notification requirements 1 standards referenced Emergency contact table
Australian Standards Referenced
AS/NZS 1891.4 — Industrial fall-arrest systems
$41.95

Swimming Pool Construction Emergency — Common Questions

Are emergency procedures a legal requirement?

Yes. Under WHS Regulation 43, PCBUs must prepare, maintain, and implement an emergency plan for the workplace. Workers must be trained in emergency procedures.

What emergencies do your procedures cover?

Our procedures cover trade-specific emergencies including injuries, chemical exposure, fire, electrical incidents, structural collapse, severe weather, and medical emergencies.

Do emergency procedures include notification requirements?

Yes. Each procedure includes who to notify (emergency services, regulators, site managers), when to notify them, and what information to provide.

Last updated: March 2026